Repair and service work for Firing Furnace at EO2 Building, Faculty of Mechanical Engineering UTM.
Thanks to Mr Saleem, assistant engineer for EO2 laboratory (Makmal Tuangan Logam) and Mr Suzaimi, our technician
ensuring progress complete within the timeframe.
Repairing and service work include replacing default part of the heater element, ceramic ring and insulator,
fiberglass blanket, and other small parts.